Hydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly Machine

Product Details
Customization: Available
After-sales Service: Video Technical Support
Warranty: 2-Year Warranty
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (21)
  • Hydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly Machine
  • Hydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly Machine
  • Hydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly Machine
  • Hydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly Machine
  • Hydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly Machine
  • Hydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly Machine
Find Similar Products
  • Overview
  • Product Description
Overview

Basic Info.

Washing Capacity
70kg
Automatic Grade
Semi-automatic
Type
Vertical
Roller Fixing Type
Portability
Brand
Waswell
Transport Package
Wooden Crate Packaging
Specification
126*59*126CM
Trademark
Waswell
Origin
Guangdong
HS Code
8479899990

Product Description

Product Description

 

Hydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly MachineHydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly MachineHydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly MachineHydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly MachineHydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly Machine

Supplier's product description

Characteristics of Shoe Head Steaming and Softening Machine
1. Before using this machine for binding, the leather toe part of the shoe is coated with heat film, which is heated and steamed by this machine to soften it for binding.
2. In terms of temperature - the normal temperature is 100-120 degrees, and the time can be adjusted according to the material, with an adjustment of about 10-20 seconds depending on the leather material.

 

Specification
 
Model
Sole marking shoe making machine
size
500*650*1620mm
Voltage
220V/380V/415V
power
0.38kW
weight
70kg
power supply
pneumatic

Shoe washing machine
Installation location requirements:1,
1. There are fled water supply and drainage pipelines, and it is confirmed that the watersupply and drainage are uno bstructed.
2. There ls a fixed power supply with leakage protection and good grounding, with a powersupply voltage of 220v, and a 10A dedicated socket installed.
3. The installatio n site has a flat and sturdy ground, and the enronment is easyto operate
4,Installation steps:
5. flrst, install the shoe washing machine in a locatlon that meets the requlrements of (firstitem).
6 Connect the watersupply and drainage pipes to the fibxed pipe openings2.3. Connect the power cord plug to a 10A dedicated socket
7. Check whether the machine installation ls smooth, whether the water plpe joints, powersupply terminals are secure, and whether the grounding is good.


Packaging and delivery
Hydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly MachineCompany Profile
Hydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly Machine

Hydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly Machine
Hydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly MachineHydraulic Shoe Final Sliding Machine Shoe Final Puller Shoe Final Disassembly Machine
FAQ

Q: How to get samples? How much is the sample fee? How long will it take?
Answer: Please confirm with us the model you want to purchase and prepay the sample fee. After the sample test is qualified, we will refund this sample fee when you order in bulk. We can send out samples within 2 working days after receiving payment.

Q: Delivery and payment term?
A: Most of our products are available in large quantities in stores and we will send them out as soon as we receive your payment.
For special needs, it takes about 15-20 working days to manufacture it.
Payment terms: EXW, FOB, CIF, C&F, etc. 30% T/T deposit, 70% balance before shipment.

Q: Shipping?
A: If your order is not big enough, door-to-door service via UPS, FEDEX, DHL, EMS is the best choice.
For bulk transportation, air or sea shipping through your freight forwarder is a normal way, we can also provide cost-effective freight forwarders for your reference.

Q: Advantages?
answer:
1) We produce parts ourselves, with more competitive prices and faster delivery;
2) We provide OEM services and submit various styles, latest designs to customers;
3) We have rich experience in providing high-quality services to customers experience.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier