Product Description
Supplier's product description
Characteristics of Shoe Head Steaming and Softening Machine
1. Before using this machine for binding, the leather toe part of the shoe is coated with heat film, which is heated and steamed by this machine to soften it for binding.
2. In terms of temperature - the normal temperature is 100-120 degrees, and the time can be adjusted according to the material, with an adjustment of about 10-20 seconds depending on the leather material.
Specification
Product name
|
3D shoe upper forming and crimping machine shoe machine manufacturing
|
Voltage
|
220V/380V
|
power
|
2.2kW
|
N.W.
|
467kg
|
G.W.
|
550kg
|
Machine size
|
870*790*1600mm
|
Packing size
|
920*830*1700mm
|
Shoe washing machine
Installation location requirements:1,
1. There are fled water supply and drainage pipelines, and it is confirmed that the watersupply and drainage are uno bstructed.
2. There ls a fixed power supply with leakage protection and good grounding, with a powersupply voltage of 220v, and a 10A dedicated socket installed.
3. The installatio n site has a flat and sturdy ground, and the enronment is easyto operate
4,Installation steps:
5. flrst, install the shoe washing machine in a locatlon that meets the requlrements of (firstitem).
6 Connect the watersupply and drainage pipes to the fibxed pipe openings2.3. Connect the power cord plug to a 10A dedicated socket
7. Check whether the machine installation ls smooth, whether the water plpe joints, powersupply terminals are secure, and whether the grounding is good.
Packaging and delivery
Company Profile
FAQ
Q: How to get samples? How much is the sample fee? How long will it take?
Answer: Please confirm with us the model you want to purchase and prepay the sample fee. After the sample test is qualified, we will refund this sample fee when you order in bulk. We can send out samples within 2 working days after receiving payment.
Q: Delivery and payment term?
A: Most of our products are available in large quantities in stores and we will send them out as soon as we receive your payment.
For special needs, it takes about 15-20 working days to manufacture it.
Payment terms: EXW, FOB, CIF, C&F, etc. 30% T/T deposit, 70% balance before shipment.
Q: Shipping?
A: If your order is not big enough, door-to-door service via UPS, FEDEX, DHL, EMS is the best choice.
For bulk transportation, air or sea shipping through your freight forwarder is a normal way, we can also provide cost-effective freight forwarders for your reference.
Q: Advantages?
answer:
1) We produce parts ourselves, with more competitive prices and faster delivery;
2) We provide OEM services and submit various styles, latest designs to customers;
3) We have rich experience in providing high-quality services to customers experience.